Project Introduction

[Beijing Capital Airport Terminal Grid Project]

北京首都機場航站樓網架工程,機場網架工程,機場航站樓網架工程
Terminal 3 of Beijing Capital International Airport, with a construction area of more than 900,000 square meters, has 99 new seats; a new runway with a length of 3,800 meters and a width of 60 meters will be built. The world's largest passenger aircraft A

Aviation industry grid

Terminal 3 of Beijing Capital International Airport, with a construction area of more than 900,000 square meters, has 99 new seats; a new runway with a length of 3,800 meters and a width of 60 meters is newly built, and the world's largest passenger aircraft Airbus A380 can also take off and land smoothly . In addition, a new North Cargo Area will be built, and the on-site transportation system will be constructed correspondingly, as well as facilities for water supply, power supply, gas supply, fuel supply, navigation, and airline bases.


Terminal 3 of Beijing Capital International Airport is composed of T3-C main building, T3-D, T3-E international terminal and traffic system in front of the building. The T3 main building has five floors on the ground and two underground floors. The first floor of the T3 main building is the baggage handling hall, the long-stay waiting hall, and domestic and international VIP; the second floor is the passenger arrival hall, the baggage claim hall, and the MRT platform; the third floor is for domestic passengers Departure hall; the fourth floor is the check-in and catering hall; the fifth floor is the catering. T3-C (domestic zone) and T3-E (international zone) are symmetrical in the shape of a person, echoing each other from the north to the south, and are connected by the red steel structure T3-D (Air China domestic zone) terminal. It is 2900 meters long from north to south, 790 meters wide, and the building height is 45 meters. Terminal 3 is much larger than the two existing terminals.

Due to the long distance between the north and south buildings of Terminal 3 (T3C and T3E), a passenger rapid transit system will be built between the two buildings to facilitate passengers. The Passenger Mover System (APM) is a fully automated passenger transportation system with unmanned driving. The MRT system adopts the design plan of Bombardier of Canada, which uses trackside and central control to transmit signals to control the operation of the vehicle. The driving route is 2080 meters long one way. There are 3 stations in T3C, T3D and T3E respectively.

The baggage system of Terminal 3 adopts the most advanced international automatic sorting and high-speed transmission system. The baggage handling system is composed of outbound, transfer, and inbound baggage handling systems, empty baggage return systems, and early baggage storage systems, covering T3C , T3D and T3E, and the corresponding area connecting T3C and T3E baggage tunnel, covers an area of about 120,000 square meters, and the total length of the system is about 70 kilometers. As long as the airline transports the baggage to the sorting port, the system only needs 4.5 minutes to transfer the baggage to the baggage claim carousel, which greatly reduces the time for passengers to wait for the baggage to be picked up.

The Transportation Center (GTC) is located in front of Terminal 3. There are two underground parking lots with a total area of 300,000 square meters. On the ground of the transportation center, there is a light rail transit station with a building area of 45,000 square meters. Housing structure. Passengers can take the light rail transit from the city to the terminal. The light rail line from Dongzhimen to the Capital Airport will branch and reach Terminals 2 and 3 respectively, and a rail connection will also be established between Terminal 3 and the original Terminal 2. The construction of off-site supporting projects such as the Second Airport Expressway, the Airport South Line Expressway, the Airport North Line Expressway, and Airport Rail Transit provides a convenient passage for passengers to and from the Capital Airport.

Beijing Capital Airport Terminal Grid Project, Jiangsu Huahai Steel Structure Grid Company focuses on stainless steel grid, carbon steel grid, bolt ball grid, dry coal shed grid, gas station grid, aviation hangar grid, etc., Contact number 13852483938
主站蜘蛛池模板: 人妻aⅴ无码一区二区三区 | 国产激情视频一区二区三区| av天堂午夜精品一区| 香蕉人妻av久久久久天天| 日本熟妇人妻xxxxx| 亚洲精品久久久久久久久久吃药 | 久久婷婷五月综合色99啪| 久久精品国产只有精品96| 把女邻居弄到潮喷的性经历| 欧美疯狂性受xxxxx另类| 国产精品人妻久久ai换脸 | 久久狠狠爱亚洲综合影院| 亚洲欧美日韩国产手机在线| 夜夜躁狠狠躁日日躁| 97国产精华最好的产品| 99久久婷婷国产综合精品电影| 久久九九兔免费精品6| 国产成人精品优优av | 免费人成无码大片在线观看| 亚洲av无码男人的天堂在线| 人妻夜夜爽天天爽三区| 桃花色综合影院| 又黄又爽又色又刺激的视频| 国产精品女人呻吟在线观看| 欧美做受视频播放| 最近中文2019字幕第二页| 国产av一区二区三区传媒| 男女作爱免费网站| 亚洲第一av导航av尤物| 亚洲精品一区二区久| 久久久久久国产精品免费免费男同 | 日本丰满少妇裸体自慰| 国产av一区二区三区日韩| 国产成人a级毛片| 国产aⅴ激情无码久久久无码| 99久热在线精品996热是什么| 色噜噜狠狠狠综合曰曰曰 | 国产乱人激情h在线观看| 粗大猛烈进出高潮视频| 国产精品国产精品国产专区不卡| 国产精久久一区二区三区|