Technical requirements and quality standards of spherical grid

更新時間:2021-02-20 10:24:11?點擊:58937 ? Grid Knowledge

Requirements for grid installation: Tighten the anchor bolts to the opposite position to ensure the reliability of the anchor bolts, and ensure that there are gaps in the sleeve specifications that are visible to no one.

When installing the components, the bending degree of the components should not exceed the safety scope of the relative national regulations. The parts that have been installed on the spherical grid should be clean, free of scratches, no defects, no significant gaps, and no dents and wrong installation conditions, to ensure that the relative sockets match accurately. If there is a wrong installation, please Immediately replace and replace in accordance with regulations.

The relative thickness and quality of the paint must be within the deviation range required by the design standard to ensure the saturation of the overall spherical grid. The deviation of the central part of the connection point of the built steel structure grid must be less than 1.5 mm, and the length of the single cone grid must not exceed ± 1.5 mm. After all the grids are installed.

The vertical and horizontal lengths of the spherical grid must be less than L/2000, and not less than or equivalent to 30mm, and the center offset of the rubber support must be less than L/3000 and less than equivalent to 30mm.

 
Spherical grid

The height difference between adjacent rubber bearings should be less than equivalent to 15mm, and the height difference between the rubber bearings in the middle of the low value should be less than equivalent to 30mm. The full load deflection value is guaranteed to be less than L/800.

Quality picking staff should prepare measuring instruments such as level, level, tape measure and auxiliary supplies cone, steel tape measure, etc., as needed for inspection. Quality inspection staff need to stay on the construction site continuously, grasp the construction status anytime and anywhere, and make records, improve the relative materials, and immediately report to the quality engineer and other superior leaders, and actively and closely cooperate with the work. Civil engineering operation of the quality management of grid installation: The regulations ensure that the parts are placed in the opposite position, and they cannot be piled up and damaged or lost.

Ensure that the surface environment of the embedded parts is clean and tidy, the middle line, the specification height and the geometric specifications must be accurate. In addition, it is also necessary to ensure that the horizontal and vertical length error is less than 30mm, the center offset of the embedded parts is less than 30mm, and the adjacent embedded parts need to be less than 15mm , The height difference of relatively large embedded parts should be less than 30mm.

Recommended Reading

主站蜘蛛池模板: 无码av波多野结衣| 深夜福利小视频在线观看| 中文字幕一区二区三区久久网站 | 色欲综合一区二区三区| 黑巨人与欧美精品一区| 丰满爆乳在线播放| 亚洲国产成人精品无码一区二区| 曰本无码人妻丰满熟妇5g影院| 中国国产免费毛卡片| 亚洲av永久无码精品放毛片| 国产亚洲人成a在线v网站| 粉嫩虎白女p虎白女在线| 久久精品人妻中文系列| 末发育娇小性色xxxxx| 亚洲av无码专区在线播放| 同桌上课脱裙子让我帮他自慰| 一本色道久久综合亚洲精品| 久久午夜夜伦鲁鲁片无码免费 | 夜夜爽日日澡人人添| 又大又硬又黄的免费视频| 亚洲av无码片vr一区二区三区| 色欲香天天天综合网站| 久久国产成人午夜av影院| 欧美黑人又粗又大高潮喷水| 伊人久久精品无码二区麻豆| 日韩一区国产二区欧美三区| 新版天堂资源中文8在线| 国产99在线 | 亚洲| 国产乱子经典视频在线观看| 亚洲av高清一区二区三区| 中文字幕久热精品视频在线| 国产精品福利一区二区| 国产麻豆9l精品三级站 | 人妻少妇精品视频二区| 日本肉体xxxx裸体137大胆| 婷婷亚洲久悠悠色悠在线播放 | 亚洲av无码国产精品久久不卡| 国产成人久久精品一区二区三区| 最新亚洲人成无码网站| 中文无码制服丝袜人妻av| 一区二区三区中文字幕|