The quality of the bolt ball net frame

更新時間:2021-02-18 10:18:08?點擊:138689 ? Grid Knowledge

The construction plan of the bolted ball grid is relatively strict. Only the designed works under scientific and reasonable conditions can ensure the safety and practicability of the construction process. Then how do we ensure the quality of the bolted ball grid What?

One is material selection. The selection of materials needs to meet the standards and control the hardness of the materials.
The second is design. This also needs to be carried out in strict accordance with national standards in order to achieve excellence, especially the design of knots.
Third, after the bolted ball grid is installed, you need to carefully check the items on both sides of the connecting table and the area around the weld in the range of 30-50mm, such as rust, drilling, and oil stains, which need to be removed during assembly.
Fourth, after the treatment is completed, it is necessary to conduct ultrasonic testing on the building. Once a substandard product occurs, it is necessary to submit post-processing requirements to avoid unforeseen consequences for the manufacturer. This is also a special test of the designer's conscience.
In order to control the quality of the bolted ball net frame parts, it is necessary to check the brand and installation dimensions. During the assembly process of the steel parts, closely monitor the date line and positioning method of the steel parts, and the assembly and inspection of the secondary steel parts after manufacturing and welding. This structure size corresponds to the three-dimensional space position inspection and acceptance assembly facilities of each rotating frame.
In addition, after the bolt ball grid is formed, the welding quality should be verified by ultrasonic inspection, and the unqualified products detected should be corrected in time, and then the steel surface should be subjected to special irradiation derusting test and correction, in accordance with the technical requirements Implement coating and anti-corrosion clock ears. The coating thickness should then be tested and prepared after the test. Proper storage, transportation and stacking measures should be taken to avoid deformation.

Recommended Reading

主站蜘蛛池模板: 艳z门照片无码av| 日本强伦姧熟睡人妻完整视频 | 亚洲中文字幕无码久久2017| 色哟哟网站在线观看| a级国产乱理论片在线观看| 天堂网www中文在线| 亚洲欧美日韩一区在线观看| 久久99国产乱子伦精品免费| 久久精品亚洲乱码伦伦中文| 大肉大捧一进一出好爽视频| 国偷自产一区二区免费视频| 亚洲中文字幕码在线电影| 性中国妓女毛茸茸视频| 国产女女精品视频久热视频 | 国产精品无码翘臀在线观看| 欧美18精品久久久无码午夜福利 | 欧美无人区码suv| 欧美激情日韩精品久久久| 亚洲一线二线三线写真| 性做久久久久久久久| 中文字幕大香视频蕉免费| 狠狠色综合久久丁香婷婷| 欧美成人免费全部| a级毛片免费观看在线| 免费无码成人片| 无码国产69精品久久久久孕妇| 亚洲国产综合精品 在线 一区| 国产av无码专区亚洲av毛片搜| 强插女教师av在线| 国产偷人妻精品一区二区在线| 少妇与大狼拘作爱| 人妻 色综合网站| 无码av一区二区大桥久未| 军人全身脱精光自慰| 激情久久av一区av二区av三区| 欧美国产激情二区三区| 亚洲色中文字幕无码av| 精品乱码久久久久久久| 久久人妻内射无码一区三区| 人妻少妇精品专区性色av| 丁香五月激情综合国产 |