蜜桃av噜噜一区二区三区_久久99国产精品久久99软件_国精产品一品二品国精在线观看_国产免费无码一区二区三区_亚洲av永久无码一区二区三区

Grid processing method

更新時間:2021-01-27 09:34:27?點擊:36969 ? Grid Knowledge

The modern construction model drives the rapid development of the steel structure grid industry. In order to strengthen the stability of grid structure buildings, Jiangsu Huahai Steel Structure has also continuously strengthened the grid processing technology. The construction method of the steel structure grid is constantly updated. Below, the editor of Jiangsu Huahai Steel Structure will introduce our company's grid processing method.


The preliminary processing of the grid frame is mainly welding, rod welding, bolt ball production and processing, and high-strength bolt production and processing. Our factory processing is fully operated in accordance with the requirements of the ISO international quality system. All technical types of work are certified to ensure the early stage Product processing quality.

The post-processing of the grid cannot avoid high-altitude operations. In order to ensure the quality of the grid engineering, the technology used is more complicated.

High-altitude grid processing method:

1. The method of high-altitude assembly

This method of splicing first requires designing the position for assembling the brackets, and then using the crane to move the grid structure into the air-designed position and assembling on the brackets. This method also has relatively high requirements for the assembly technology. The strong bolts are connected in succession, and the steel grid is used for construction.

2. Overall installation method

It is to assemble the net frame on the ground into a whole, and then use the equipment in it to lift the whole to the designed position and fix it. This construction method requires not very high assembly brackets, and there are many high-altitude construction techniques, but the quality of its welding technology must be guaranteed. The technology is also more complicated, and it is more suitable for the fulcrum of the entire steel grid.

3. Multi-machine lifting method

The use of this method is mainly used for small and medium-sized grid structures that are not very large in height and weight. Before installation, it is necessary to progress the dislocation assembly method of the grid on the ground, and then use multiple cranes to assemble it. The net frame is lifted as a whole, and it can be fixed after falling in the air.

Recommended Reading

主站蜘蛛池模板: 国产日韩av在线播放| 欧洲熟妇色xxxx欧美老妇免费| 日本va欧美va欧美va精品| 青草青草视频2免费观看| 体育生gay自慰网站| 国产亚洲精品久久久久四川人| 激情国产一区二区三区四区小说| 全黄性性激高免费视频| 中文一国产一无码一日韩 | 国产亚洲成av片在线观看| 一本色综合久久| 国产精品亚洲a∨天堂不卡| 97精品超碰一区二区三区| 久久人妻公开中文字幕| 乱熟女高潮一区二区在线| 国产网红主播精品一区| 成人无码区免费a片www| 欧美三级真做在线观看| 网禁拗女稀缺资源在线观看| 亚洲一区二区三区偷拍女厕| 熟妇熟女乱妇乱女网站| 极品少妇小泬50pthepon| 亚洲精品夜夜夜| 国产精品国产三级国产普通话| 国产探花在线精品一区二区| 亚洲女人被黑人巨大进入| 亚洲精品乱码久久久久久蜜桃| 日韩免费视频| 亚洲av无码1区2区久久| 极品少妇hdxx麻豆hdxx| 国产999精品久久久久久| 风韵丰满熟妇啪啪区老老熟妇| 亚洲av无码成h人动漫无遮挡| 好爽好紧好大的免费视频国产| 精品人妻潮喷久久久又裸又黄| 成人免费ā片在线观看| 精品久久久久久中文字幕大豆网| 亚洲人成电影网站色www两男一女| 日韩欧美亚洲综合久久影院ds| 国产精品福利一区二区久久| 无码国产精品一区二区免费模式|