Three common construction methods for grid bolt balls

更新時間:2021-03-08 10:30:00?點擊:120312 ? Industry Views

The processing of grid bolt balls is quite special. This kind of device is generally only used in the grid structure and is not a popular device. Therefore, when constructing this kind of device, it is necessary to formulate the model and style of the bolt ball according to the size and model of the grid steel rod, and there are three ways to install the bolt ball. Let's take a look together.


1. Production of hollow steel balls and steel pipe rods

In order to ensure the installation and quality of the grid and grid bolt ball processing, all hollow steel ball nodes and steel pipe rods are processed in the factory. The steel ball is processed by fetal membrane, and the raw material is 45 steel. The edge is trimmed by a lathe, and the allowable tolerance for processing is: diameter deviation ±1mm, spherical ellipticity deviation <1mm. The allowable deviation of the length of the steel pipe rod is ±1mm, the end face of the rod must be perpendicular to the rod axis, and the allowable deviation is 0.5% R (R is the steel pipe radius), and the maximum bend of the steel pipe rod shall not be greater than 1/1000 of the rod length.

2. Installation of steel grid

Based on and guided by computer simulation theory, a detailed assembly plan was formulated. According to the characteristics of the engineering structure and the layout of the construction site, set up a scaffolding work platform on the ground, lay wooden boards on the scaffold, and then assemble the grid and grid bolt balls on the scaffolding work platform. The assembly of the grid is carried out by the aerial bulk method. construction. According to the actual situation of the grid structure and the characteristics of left-right symmetry, in order to reduce the accumulation of errors in the assembly project of the grid, the assembly of the overall grid should start from the 8 axis and 9 axis of the starting unit, and the starting unit should be assembled first. The vertical and horizontal axis can be adjusted at any time, and the starting unit grid frame can be unfolded from the center to both sides after the starting unit grid frame is deemed correct. During the assembling process, the rods are hoisted in place by the squeegee, and they are assembled and bolted at the design position.

3. Assembling the starting unit

Directly assemble a single rod and a single node into a grid, and the position of each node during the assembling process should be measured and checked. After the grid frame of the starting unit is installed, the self-check is carried out immediately to ensure that the bolts at all nodes are fastened in place. Carry out positioning electric welding (welding 3 points at each support) to ensure that the grid will not be displaced during the subsequent installation process. Then they are assembled in two directions with the starting unit as the center.

Recommended Reading

主站蜘蛛池模板: 少妇高潮惨叫久久久久电影69| 日韩一区二区三免费高清| 国产欧美日韩亚洲一区二区三区| 欲色欲色天天天www| 亚洲人成人网站18禁| 日日猛噜噜狠狠扒开双腿小说 | 国产熟睡乱子伦午夜视频| 国产又色又爽又黄又免费| 欧美性色黄大片a级毛片视频| 综合色就爱涩涩涩综合婷婷| 国产69精品久久久久孕妇| 特黄a级毛片免费视频| 成+人+网+站+免费观看| 日日躁夜夜躁白天躁晚上| 色偷偷色噜噜狠狠网站30根| 人妻换人妻仑乱| 末成年女av片一区二区丫| 精品久久久久久777米琪桃花| 亚洲av永久无码精品水牛影视| 成人片黄网站a毛片免费| 亚洲av日韩综合一区| 午夜免费啪视频在线观看| 蜜臀av999无码精品国产专区| √最新版天堂资源网在线| 久久久久人妻精品一区三寸蜜桃| 东京热tokyo综合久久精品| 人妻熟女一区二区aⅴ图片| 亚洲av日韩av高潮无码专区| 大地资源网第二页免费观看| 国产精品久久久久久人妻精品 | 藏春阁福利视频| 欧美网站免费观看在线| 国产精品国产三级国快看| 日本久久久久亚洲中字幕| 成人国产欧美大片一区| 国产人成无码视频在线观看| 国产亚洲av综合人人澡精品| 亚洲精品无码国产片| 在线永久免费观看黄网站| 四虎影视永久在线观看| 日韩人妻精品无码一区二区三区|