蜜桃av噜噜一区二区三区_久久99国产精品久久99软件_国精产品一品二品国精在线观看_国产免费无码一区二区三区_亚洲av永久无码一区二区三区

Project Introduction

[Beijing Capital Airport Terminal Grid Project]

北京首都機場航站樓網架工程,機場網架工程,機場航站樓網架工程
Terminal 3 of Beijing Capital International Airport, with a construction area of more than 900,000 square meters, has 99 new seats; a new runway with a length of 3,800 meters and a width of 60 meters will be built. The world's largest passenger aircraft A

Aviation industry grid

Terminal 3 of Beijing Capital International Airport, with a construction area of more than 900,000 square meters, has 99 new seats; a new runway with a length of 3,800 meters and a width of 60 meters is newly built, and the world's largest passenger aircraft Airbus A380 can also take off and land smoothly . In addition, a new North Cargo Area will be built, and the on-site transportation system will be constructed correspondingly, as well as facilities for water supply, power supply, gas supply, fuel supply, navigation, and airline bases.


Terminal 3 of Beijing Capital International Airport is composed of T3-C main building, T3-D, T3-E international terminal and traffic system in front of the building. The T3 main building has five floors on the ground and two underground floors. The first floor of the T3 main building is the baggage handling hall, the long-stay waiting hall, and domestic and international VIP; the second floor is the passenger arrival hall, the baggage claim hall, and the MRT platform; the third floor is for domestic passengers Departure hall; the fourth floor is the check-in and catering hall; the fifth floor is the catering. T3-C (domestic zone) and T3-E (international zone) are symmetrical in the shape of a person, echoing each other from the north to the south, and are connected by the red steel structure T3-D (Air China domestic zone) terminal. It is 2900 meters long from north to south, 790 meters wide, and the building height is 45 meters. Terminal 3 is much larger than the two existing terminals.

Due to the long distance between the north and south buildings of Terminal 3 (T3C and T3E), a passenger rapid transit system will be built between the two buildings to facilitate passengers. The Passenger Mover System (APM) is a fully automated passenger transportation system with unmanned driving. The MRT system adopts the design plan of Bombardier of Canada, which uses trackside and central control to transmit signals to control the operation of the vehicle. The driving route is 2080 meters long one way. There are 3 stations in T3C, T3D and T3E respectively.

The baggage system of Terminal 3 adopts the most advanced international automatic sorting and high-speed transmission system. The baggage handling system is composed of outbound, transfer, and inbound baggage handling systems, empty baggage return systems, and early baggage storage systems, covering T3C , T3D and T3E, and the corresponding area connecting T3C and T3E baggage tunnel, covers an area of about 120,000 square meters, and the total length of the system is about 70 kilometers. As long as the airline transports the baggage to the sorting port, the system only needs 4.5 minutes to transfer the baggage to the baggage claim carousel, which greatly reduces the time for passengers to wait for the baggage to be picked up.

The Transportation Center (GTC) is located in front of Terminal 3. There are two underground parking lots with a total area of 300,000 square meters. On the ground of the transportation center, there is a light rail transit station with a building area of 45,000 square meters. Housing structure. Passengers can take the light rail transit from the city to the terminal. The light rail line from Dongzhimen to the Capital Airport will branch and reach Terminals 2 and 3 respectively, and a rail connection will also be established between Terminal 3 and the original Terminal 2. The construction of off-site supporting projects such as the Second Airport Expressway, the Airport South Line Expressway, the Airport North Line Expressway, and Airport Rail Transit provides a convenient passage for passengers to and from the Capital Airport.

Beijing Capital Airport Terminal Grid Project, Jiangsu Huahai Steel Structure Grid Company focuses on stainless steel grid, carbon steel grid, bolt ball grid, dry coal shed grid, gas station grid, aviation hangar grid, etc., Contact number 13852483938
主站蜘蛛池模板: 国产精久久一区二区三区| 国产精品a成v人在线播放| 亚洲av无码一区二区三区在线播放 | 猫咪av成人永久网站在线观看| 亚洲熟女乱色综合亚洲小说| 精品亚洲成a人无码成a在线观看 | 亚洲精品国产一区二区精华液| 精品国产粉嫩内射白浆内射双马尾| 最新国产精品亚洲| 国产内射老熟女aaaa∵| 亚洲日韩av无码中文字幕美国| 女人夜夜春高潮爽a∨片传媒 | 国产日产欧产精品精品蜜芽| 777米奇久久最新地址| 777米奇色狠狠俺去啦| 2022国产成人精品视频人| 国产成人精品999在线观看| 强 暴 疼 哭 处 女 身子视频| 无码成a毛片免费| 熟睡中被义子侵犯在线播放| 亚洲欧美在线观看| 亚洲精品92内射| 国产成人乱码一二三区18| 精品久久久久久无码人妻| 久久香蕉超碰97国产精品| 亚洲人成人网站18禁| 国产suv精品一区| 国产乱人伦无无码视频试看| 无码人妻精品一区二区三区东京热| 狠狠爱俺也去去就色| 国产伦精品一区二区三区妓女下载| 亚洲 激情 小说 另类 欧美| 欧洲精品码一区二区三区| 最新亚洲人成无码网站| 亚洲精品成人片在线观看| 国产乱子伦一区二区三区四区五区| 久久人人爽人人爽人人片av麻烦| 成人免费毛片内射美女-百度| 99久久精品免费看国产| 两根大肉大捧一进一出好爽视频| 丁香婷婷综合激情五月色|