Steel grid

更新時間:2020-12-04 09:02:13?點擊:36721 ? Grid Knowledge

Steel grid is the construction of grid structure with steel as the main material. The main materials of steel structure include seamless steel pipes, steel balls, high-strength bolts and other materials.

The following briefly introduces the installation method of the steel grid through the installation process and the commonly used installation methods.

One. Installation process of steel grid

1. Check the line and elevation of the grid support axis before installation. The grid axis and elevation position must meet the design requirements and relevant standards.
2. Check the strength of the concrete at the top of the column before installation. The concrete at the top of the column must meet the design requirements and the current national standards before installation.
3. When using the high-altitude sliding method, check the sliding track pulleys, and the sliding horizontal slope should meet the requirements of the construction design.
4. When using strip or block installation and workbench sliding method, the ground workbench and sliding equipment should be inspected, and a trial sliding test should be carried out.
5. When using overall hoisting or partial hoisting, the lifting equipment should be inspected, and the lifting speed, lifting point, high-altitude closing and adjustment should be tested, and it must meet the requirements of the construction organization design.
6. When the high-altitude bulk method is used, red scaffolding should be erected, and the positions and elevations of the fulcrums should be laid out. When the bolt ball high-altitude bulk method is adopted, the temporary fulcrum should be designed and arranged, and the location and quantity of the temporary fulcrum should be confirmed by checking calculation.
7. The temporary fulcrum for high-altitude bulk loading should be jack, so that the temporary fulcrum can gradually adjust the height of the grid. When the temporary support is removed after the installation, it can be lowered synchronously between the fulcrums and unloaded in sections.



Second, the installation method of steel grid

1. High-altitude bulk method: It is suitable for various types of grids connecting nodes with bai bolts, and a cantilever construction method with fewer supports should be adopted;
2. Splitting or splitting installation method: suitable for grids with small changes in stiffness and stress conditions after splitting, such as two-way orthogonal quadrangular pyramids, positive evacuated quadrangular pyramids and other grids; splitting or splitting The size should be determined according to the lifting capacity;
3. High-altitude sliding method: It is suitable for the grids such as the quadrangular pyramid, the quadrangular pyramid is evacuated and the two-way orthogonal quadrangular pyramid is placed. When sliding, the sliding unit should be guaranteed to become a geometrically invariant system;
4. Integral hoisting method: suitable for various types of grids, which can be translated or rotated at high altitude when hoisting;
5. Overall lifting method: suitable for surrounding support and multi-point support grids, and can be constructed with small machines such as board lifts and hydraulic jacks;
6. Overall jacking method: suitable for multi-point support grid with fewer fulcrums;
7. When using hoisting or hoisting and jacking installation methods, the following factors should be considered in the selection of the position and number of the hoisting points:
    (1) It should be close to the force condition when the grid structure is in use;
    (2) The maximum reaction force of the lifting point should not be greater than the load capacity of the lifting equipment;
    (3) The load of each lifting equipment should be close.
The above content is organized by Huahai Steel Structure Grid for everyone. For more content, please pay attention to the official website of Huahai Steel Structure: www.ahro.cn

Recommended Reading

主站蜘蛛池模板: 野外性史欧美k8播放| 国产精品嫩草99av在线| 内射后入在线观看一区| 午夜理理伦电影a片无码| 麻豆av传媒蜜桃天美传媒| 久久久中日ab精品综合| 国产偷倩视频| 国产 亚洲 制服 无码 中文 | 搡女人真爽免费视频大全| 美女扒开屁股让男人桶| 久久久久波多野结衣高潮| 精品精品国产高清a毛片| 狠狠躁日日躁夜夜躁2022麻豆| 国产一区二区内射最近更新| 国产内射性高湖| 久久精品国产亚洲av麻豆色欲| 国产人成高清在线视频99| 国产精品原创av片国产日韩| 久久天天躁狠狠躁夜夜免费观看| 国产精品久久久福利| 国产精品无码一本二本三本色| 亚洲av乱码一区二区三区香蕉| 同性男男黄gay片免费| 无码人妻精品一区二区在线视频| 日本50岁丰满熟妇xxxx| 久久aaaa片一区二区| 久久人妻天天av| 亚洲av成人无码一区无广告| 女同学喂我乳我脱她胸罩| 亚洲成a人一区二区三区| 熟女人妻视频| 欧美日韩精品一区二区视频| 欧美肥妇bwbwbwbxx| 人妻熟妇乱又伦精品视频app| 亚洲日韩av在线观看| 久久精品国产亚洲av大全| 国内精品久久久久影院免费 | 真人与拘做受免费视频一| 业余 自由 性别 成熟偷窥| 内射无码专区久久亚洲| 午夜性又黄又爽免费看尤物|