蜜桃av噜噜一区二区三区_久久99国产精品久久99软件_国精产品一品二品国精在线观看_国产免费无码一区二区三区_亚洲av永久无码一区二区三区

The quality of the bolt ball net frame

更新時間:2021-02-18 10:18:08?點擊:138689 ? Grid Knowledge

The construction plan of the bolted ball grid is relatively strict. Only the designed works under scientific and reasonable conditions can ensure the safety and practicability of the construction process. Then how do we ensure the quality of the bolted ball grid What?

One is material selection. The selection of materials needs to meet the standards and control the hardness of the materials.
The second is design. This also needs to be carried out in strict accordance with national standards in order to achieve excellence, especially the design of knots.
Third, after the bolted ball grid is installed, you need to carefully check the items on both sides of the connecting table and the area around the weld in the range of 30-50mm, such as rust, drilling, and oil stains, which need to be removed during assembly.
Fourth, after the treatment is completed, it is necessary to conduct ultrasonic testing on the building. Once a substandard product occurs, it is necessary to submit post-processing requirements to avoid unforeseen consequences for the manufacturer. This is also a special test of the designer's conscience.
In order to control the quality of the bolted ball net frame parts, it is necessary to check the brand and installation dimensions. During the assembly process of the steel parts, closely monitor the date line and positioning method of the steel parts, and the assembly and inspection of the secondary steel parts after manufacturing and welding. This structure size corresponds to the three-dimensional space position inspection and acceptance assembly facilities of each rotating frame.
In addition, after the bolt ball grid is formed, the welding quality should be verified by ultrasonic inspection, and the unqualified products detected should be corrected in time, and then the steel surface should be subjected to special irradiation derusting test and correction, in accordance with the technical requirements Implement coating and anti-corrosion clock ears. The coating thickness should then be tested and prepared after the test. Proper storage, transportation and stacking measures should be taken to avoid deformation.

Recommended Reading

主站蜘蛛池模板: 欧美肥老太牲交| 疯狂添女人下部视频免费| 精品无码人妻一区二区三区品 | 欧美老熟妇乱子伦视频| 国产午夜福利精品一区二区三区| 乱人伦人妻精品一区二区| 午夜丰满少妇性开放视频| 色欲一区二区三区精品a片| 无码人妻少妇久久中文字幕| 波多野结衣乳巨码无在线| 丰满少妇被猛烈进入av久久| 国产精品国产三级国av| 无码中文字幕va精品影院| 亚洲一区无码精品色| 欧美v国产v亚洲v日韩九九| 成熟妇人a片免费看网站| 无码无套少妇毛多18p| 欧美黑人粗暴多交高潮水最多| 成年轻人电影免费无码| 免费又黄又爽又猛的毛片| 老色鬼久久亚洲av综合| 久久精品中文字幕一区| 国产色欲av一区二区三区| 狠狠躁夜夜躁人人爽天天开心婷婷| 无码专区一va亚洲v专区在线| 曰本女人与公拘交酡| 日本牲交大片免费观看| 日本大骚b视频在线| 亚洲精品无码专区久久久| 色偷偷久久一区二区三区| 97久久国产亚洲精品超碰热| 性刺激的欧美三级视频中文字幕| 亚洲人交乣女bbw| 人妻少妇精品中文字幕av| 一边吃奶一边添p好爽高清视频| 国产熟女露脸大叫高潮| 国产成人亚洲精品另类动态| 国产欧美一区二区精品久久久| 国产人妻人伦精品1国产丝袜| 精品久久久久久人妻无码中文字幕| 曝光无码有码视频专区|