Grid processing method

更新時間:2021-01-27 09:34:27?點擊:36969 ? Grid Knowledge

The modern construction model drives the rapid development of the steel structure grid industry. In order to strengthen the stability of grid structure buildings, Jiangsu Huahai Steel Structure has also continuously strengthened the grid processing technology. The construction method of the steel structure grid is constantly updated. Below, the editor of Jiangsu Huahai Steel Structure will introduce our company's grid processing method.


The preliminary processing of the grid frame is mainly welding, rod welding, bolt ball production and processing, and high-strength bolt production and processing. Our factory processing is fully operated in accordance with the requirements of the ISO international quality system. All technical types of work are certified to ensure the early stage Product processing quality.

The post-processing of the grid cannot avoid high-altitude operations. In order to ensure the quality of the grid engineering, the technology used is more complicated.

High-altitude grid processing method:

1. The method of high-altitude assembly

This method of splicing first requires designing the position for assembling the brackets, and then using the crane to move the grid structure into the air-designed position and assembling on the brackets. This method also has relatively high requirements for the assembly technology. The strong bolts are connected in succession, and the steel grid is used for construction.

2. Overall installation method

It is to assemble the net frame on the ground into a whole, and then use the equipment in it to lift the whole to the designed position and fix it. This construction method requires not very high assembly brackets, and there are many high-altitude construction techniques, but the quality of its welding technology must be guaranteed. The technology is also more complicated, and it is more suitable for the fulcrum of the entire steel grid.

3. Multi-machine lifting method

The use of this method is mainly used for small and medium-sized grid structures that are not very large in height and weight. Before installation, it is necessary to progress the dislocation assembly method of the grid on the ground, and then use multiple cranes to assemble it. The net frame is lifted as a whole, and it can be fixed after falling in the air.

Recommended Reading

主站蜘蛛池模板: 欧美性大战久久久久久| 两个奶头被吃高潮视频| 好爽好紧好大的免费视频国产| 欧美丰满熟妇性xxxx| 欧美黑人又粗又大久久久 | 欧美超大胆裸体xx视频| 髙清国产性猛交xxxand| 国产精品无码一区二区三区| 亚洲欧美日韩中文高清www777| 色综合久久天天综合| 日韩一区二区三区射精| 欧美18精品久久久无码午夜福利 | 国精产品一品二品国精在线观看 | 国产三级在线观看免费| 麻豆一区二区三区蜜桃免费| 亚洲国产一成人久久精品| 亚洲av成人片无码| 欧洲精品码一区二区三区免费看| 国产大片内射1区2区| 亚洲日韩成人无码| 亚洲欧美国产双大乳头| 国产69精品久久久久99尤物| 把插八插露脸对白内射| 亚洲午夜福利在线观看| 强插女教师av在线| 无码办公室丝袜ol中文字幕| 337p粉嫩日本欧洲亚洲大胆| 丰满少妇大力进入av亚洲| 强行无套内谢大学生初次| 国产精品成人3p一区二区三区| 国产真实露脸乱子伦原著| 无码任你躁久久久久久老妇| 亚洲 欧美 另类 在线| 日本一卡精品视频免费| 精品国产三级a∨在线欧美| 久久婷婷五月综合97色一本一本| 99精品久久99久久久久| 99久无码中文字幕一本久道 | 亚洲综合无码一区二区三区| 在线播放无码高潮的视频| 国产精品久久久久一区二区三区 |