Three common construction methods for grid bolt balls

更新時間:2021-03-08 10:30:00?點擊:120312 ? Industry Views

The processing of grid bolt balls is quite special. This kind of device is generally only used in the grid structure and is not a popular device. Therefore, when constructing this kind of device, it is necessary to formulate the model and style of the bolt ball according to the size and model of the grid steel rod, and there are three ways to install the bolt ball. Let's take a look together.


1. Production of hollow steel balls and steel pipe rods

In order to ensure the installation and quality of the grid and grid bolt ball processing, all hollow steel ball nodes and steel pipe rods are processed in the factory. The steel ball is processed by fetal membrane, and the raw material is 45 steel. The edge is trimmed by a lathe, and the allowable tolerance for processing is: diameter deviation ±1mm, spherical ellipticity deviation <1mm. The allowable deviation of the length of the steel pipe rod is ±1mm, the end face of the rod must be perpendicular to the rod axis, and the allowable deviation is 0.5% R (R is the steel pipe radius), and the maximum bend of the steel pipe rod shall not be greater than 1/1000 of the rod length.

2. Installation of steel grid

Based on and guided by computer simulation theory, a detailed assembly plan was formulated. According to the characteristics of the engineering structure and the layout of the construction site, set up a scaffolding work platform on the ground, lay wooden boards on the scaffold, and then assemble the grid and grid bolt balls on the scaffolding work platform. The assembly of the grid is carried out by the aerial bulk method. construction. According to the actual situation of the grid structure and the characteristics of left-right symmetry, in order to reduce the accumulation of errors in the assembly project of the grid, the assembly of the overall grid should start from the 8 axis and 9 axis of the starting unit, and the starting unit should be assembled first. The vertical and horizontal axis can be adjusted at any time, and the starting unit grid frame can be unfolded from the center to both sides after the starting unit grid frame is deemed correct. During the assembling process, the rods are hoisted in place by the squeegee, and they are assembled and bolted at the design position.

3. Assembling the starting unit

Directly assemble a single rod and a single node into a grid, and the position of each node during the assembling process should be measured and checked. After the grid frame of the starting unit is installed, the self-check is carried out immediately to ensure that the bolts at all nodes are fastened in place. Carry out positioning electric welding (welding 3 points at each support) to ensure that the grid will not be displaced during the subsequent installation process. Then they are assembled in two directions with the starting unit as the center.

Recommended Reading

主站蜘蛛池模板: 免费a级毛片无码免费视频| 亚洲av日韩av永久无码下载 | 天堂√在线中文官网在线| 亚洲区欧美区综合区自拍区| 亚洲欧美v国产一区二区| 亚洲av无码成h在线观看| 无码少妇高潮浪潮av久久| 无码任你躁久久久久久老妇| 国产成人精品日本亚洲直播| 激情内射亚洲一区二区三区| 撕开奶罩揉吮奶头视频| 久久精品国产99精品最新| 国产思思99re99在线观看| a级毛片免费全部播放| 六十路高龄老熟女m| 精品久久久久久中文字幕| 日本熟妇色熟妇在线视频播放| 中国凸偷窥xxxx自由视频| www片香蕉内射在线88av8 | 无码国产精品一区二区av| 中文字幕一区二区人妻电影| 亚洲春色av无码专区在线播放| 久久精品国产亚洲av网站| 久久av无码精品人妻系列| 一本一道vs无码中文字幕| 日韩亚洲av无码一区二区三区| 国模杨依粉嫩蝴蝶150p| 色婷婷久久久swag精品| 欧美成人免费全部网站| 亚洲最大成人网色| 少妇粗大进出白浆嘿嘿视频| 亚洲色欲久久久综合网| 国产未成女一区二区| 综合网日日天干夜夜久久| 国产大片内射1区2区| 无遮无挡三级动态图| 亚洲av电影天堂男人的天堂| 久久99国产乱子伦精品免费| 丝袜人妻一区二区三区网站| 丰满岳乱妇久久久| 激情都市 校园 人妻 武侠|